Minor Improvements – Physical Therapy Center
This cutting edge physical therapy center for children and young adults included the challenging installation of a pre-fabricated 12′ x 26′ aqua-therapy pool. A number of specialized mechanical and vapor barrier systems were employed to maintain the water temperature of the pool at a constant 92 degrees, the air temperature at 88-90 degrees in the pool room and the relative humidity low enough to prevent damage to the building.
Year Built:
2003
Project Duration:
7 MONTHS
Location:
SARATOGA SPRINGS NY
Square Footage:
17,000
Architect:
BUTLER ROWLAND MAYS ARCHITECTS